Second publicity of environmental impact assessmen

2022-10-14
  • Detail

Second publicity of environmental impact assessment of long run fat coating expansion project

issued by: Shanghai Research Institute of chemical industry

release date: June 21, 2010

1. Description

Shanghai Research Institute of chemical industry (Evaluation Agency) is entrusted by Shanghai long run fat coating Co., Ltd. (construction unit) to carry out environmental impact assessment of the expansion project of Shanghai long run fat coating Co., Ltd. The second information release is now made to the public in accordance with national and municipal laws and regulations

Shanghai Research Institute of chemical industry and Shanghai changrunfa coating Co., Ltd. are responsible for the authenticity of the information released at this stage. With the implementation process of the project and the implementation of environmental impact assessment, relevant information will be improved or adjusted

2. Overview of the construction project

(1) project name: 10000t/a alkyd resin, acrylic resin, PE unsaturated resin and PU polyurethane curing agent production expansion project of Shanghai changrunfa coating Co., Ltd.

(2) project location: No. 578, Xiasheng Road, Jinshan second industrial zone, Shanghai, Shanghai changrunfa coating Co., Ltd. has an existing plant area

(3) industry of the project: chemical raw materials and chemical products manufacturing

(4) project content: resin production workshop; Heat transfer oil furnace, air compressor room and other public facilities; Storage facilities of class a warehouses and tanks; Environmental protection projects such as waste gas and waste water treatment system supporting the workshop; Comprehensive building and other office facilities

(5) reasons for the conclusion of the environmental impact assessment of the project: the oxide skin or iron pin on the test piece fell into the drag surface between the axle rod wood clamp plate and the bearing beam, resulting in seizure or friction resistance expansion "

this project meets the requirements of relevant national and Shanghai industrial policies; The production of products conforms to cleaner production, and the emission of pollutants can meet the environmental protection requirements such as up to standard emission and total amount control after implementing various treatment measures; The environmental risk during the operation of the project is small; The environmental impact prediction shows that after the project is put into operation, the discharged pollutants have little impact on the surrounding environment, and the environmental risk is acceptable. Therefore, from the perspective of environmental protection, the construction of this project is feasible

3. Environmental impact assessment document of construction project

(1) simplified report (link)

(2) review period: 10 days from the date of information release

4. Contact person and contact information of the evaluation institution

(1) evaluation institution: Shanghai Research Institute of chemical industry

(2) Certificate Number: EIA Zheng Jia Zi No. 1806

(3) mailing address: Building 8, No. 345 Yunling East Road, Putuo District, Shanghai

(4) Lianlian adheres to the sustainable development path of intensification, energy conservation and ecology, which seems to be a major and urgent task. Stakeholders: Guo Gong, Chen Gong

(5) contact information

: × 1634、1682; Fax:

e-mail: chenxh@

5. Scope of soliciting public opinions

opinions and suggestions on environmental protection of construction projects through regulating and controlling the internal pore structure protection of composite materials. The main solicitation contents are as follows:

(1) whether the construction of this project is recognized

(2) the possible impact of the construction of the project on the surrounding environment

(3) reasonable suggestions on environmental protection management and measures of the project

(4) other ideas and suggestions on environmental protection

6. Public feedback

(1) feedback method

the public can express their views on the construction of the project and the environmental assessment work by submitting comments to the publicity station, calling, sending letters, faxes, etc. Please refer to point 4 for contact information

(2) feedback time limit

the time for the public to put forward their opinions is within 10 working days from the date of the announcement (the postmark date shall prevail for letters)

7. The valid period of information release is